Fab Tool Capacity
Wafer starts pass through lithography, etch/deposition, metrology, and probe/test before becoming qualified output. Each stage can be the bottleneck, and relieving one exposes the next. Budget alone doesn't help when the binding limit is tool availability.
Which tool family caps qualified wafers this month, and what becomes active if that constraint is relieved?
The model is a sequential fab flow from wafer starts to qualified wafers. Stage edges carry wafer volume with yield, cost, and carbon rates. Capacity constraints sit on lithography, metrology, and probe/test; the solve maximizes qualified wafers and ranks the active tool limits.
- Lithography fully loaded
- Metrology near limit
Lithography is the current limit. Once scanner capacity opens, metrology becomes the next governing limit — not budget.